Thursday, June 4, 2015

Basement Bathroom Reno, Part 4 - Resurfacing (inside and out)

I'd love to say that this post was going to be all about the final surfaces, like paint and tile, but we're so not to that point, yet. And so - obviously - we weren't there 2 weeks ago.

But, we got new, leveler, concrete for the floor. The whole in the utility room got filled in. The walls got insulated. And - we got a new window!


New bathroom subfloor.
This is where that hole in the floor used to be.
New insulation - and new window!
At the same time, I thought you might like to see what we've been living with downstairs. I am not a fan of concrete and drywall dust, so before they even started, we kind of walled off the bathroom area with plastic sheeting. The pup hates it (which is kind of okay, since she's not supposed to be downstairs running around these days). But, frankly, so do the rest of us.

It's a little like the strips that hang in front of a professional freezer...
It's hard to see it, but on the other side of the dryer is a kind of two-layer protection.
I'm happy to say that we've got some forward movement going on this week. I'll get some pictures up soon.

No comments: